New connection

  • Step 1:
    New connection details
  • Step 2:
    Personal Details
  • Step 3:
    Confirmation

This form is used to request an electricity connection for a new building.

If your household requires a continuous supply of electricity to run critical medical equipment, such as those listed under the Life Support Equipment Subsidy Scheme, please contact us on 13 13 53 to arrange your new connection.

Before you begin

You will need the following:

  • An email address
  • A contact telephone number

Before we can establish the connection, you will need to enter into an electricity supply contract and establish an account.

* Required fields

New Connection

Connection address

Please enter either a lot number, location number, or house number

OR
OR
*
*
*
*

WA

Construction details

An owner/builder is a property-owner who assumes responsibility for the overall task of building a property, rather than using a contractor
Can we directly contact the builder/developer to arrange the new connection?*
i.e. underground dome or overhead connection
  • To determine if you require a 3 phase connection, speak to your builder or electrical contractor
  • To check if a 3 phase is available in your area please contact Western Power on 13 10 87

  • Select Completion Date
    Would you like a Synergy representative to call you to discuss product options and prices?
    icons: graphs

    View My Account